FiT Rates

Malaysia Feed in Tariff Rates depends on various factors. Such factors are:

  • The type of RE technology used (whether it’s a small hydro, biogas, biomass, or solar PV)
  • Capacity of the RE technology used
  • RE installation commencement date
  • Whether the RE technology has met any criteria that entitles for an additional bonus FiT rate

Solar PV FiT Rates:

RE Installation Capacity

FiT Rate

(RM/kWh)

Effective Period

Yearly Degression Rate
Up to 4kWp installed capacity 1.23 21 years 8%
Above 4kWp up to 24kWp 1.20 21 years 8%
Above 24kWp up to 72kWp 1.18 21 years 8%
Above 72kWp up to 1MWp 1.14 21 years 8%
Above 1MWp up to 10MWp 0.95 21 years 8%
Above 10MWp up to 30MWp 0.85 21 years 8%
Additional if installed in building structures +0.26 21 years 8%
Additional for using building materials +0.25 21 years 8%
Additional for using assembled Solar PV modules +0.03 21 years

8%

Additional for using assembled Solar inverters +0.01 21 years 8%