Malaysia Feed in Tariff: RE Quota

In order to guarantee fairer share, SEDA Malaysia has capped the RE Installation capacities, particularly for Solar PV, for different categories. Capping is putting a quota or a limit for 6 months time period for the next 3 years. This 6-month time frame is the period allotted should there be next available set of quotas. The following tables show RE Quota for Solar PV Installation:

Available MW Capacity for FiT Application

2013

2014

H1

H2

H1

H2

Housing Developer

0.00

0.00

0.00

0.00

Individual

2.86

1.99

0.00

0.00

Non-individual (<500kW)

0.00

0.00

0.00

0.00

Non-individual (>500kW)

0.00

0.00

0.00

0.00

Allocated MW Capacity

2013

2014

H1

H2

H1

H2

Housing Developer

0.00

0.00

0.00

0.00

Individual

4.70

0.47

0.00

0.00

Non-individual (<500kW)

1.98

1.30

0.72

0.00

Non-individual (>500kW)

32.26

26.24

30.53

0.00