NEM Connection Scheme

The NEM connection scheme takes the following into consideration Safety Compliance to regulatory requirements Cost Connection with minimum changes to the existing network Types of Connection For indirect Solar PV power generation system, following types are connection are required. Type A – required for LV customers Type B – required for MV/HV customers Which type…

Net Metering Testing & Commissioning Requirement

When it comes to net metering testing, following tests are required.  Inverter compliance test  NEM consumer is required to comply that the inverter units are according to the  requirements of the guidelines. The certified results of the compliance test have  to be submitted for verification.  Interconnection compliance tests Before going ahead with commissioning, it’s required you test…

NEM Application Process

It’s mandatory for the NEM consumer to submit the application to Distribution Licensee so they can perform technical assistance on the submission. This technical assistance is required for all indirect Solar PV power generation systems running above the capacity of 12kWp. Here are the benefits of this assessment: Safety Helps the NEM applicant to determine…