The NEM connection scheme takes the following into consideration Safety Compliance to regulatory requirements Cost Connection with minimum changes to the existing network Types of Connection For indirect Solar PV power generation system, following types are connection are required. Type A – required for LV customers Type B – required for MV/HV customers Which type…
When it comes to net metering testing, following tests are required. Inverter compliance test NEM consumer is required to comply that the inverter units are according to the requirements of the guidelines. The certified results of the compliance test have to be submitted for verification. Interconnection compliance tests Before going ahead with commissioning, it’s required you test…
It’s mandatory for the NEM consumer to submit the application to Distribution Licensee so they can perform technical assistance on the submission. This technical assistance is required for all indirect Solar PV power generation systems running above the capacity of 12kWp. Here are the benefits of this assessment: Safety Helps the NEM applicant to determine…
1. Why do I need to care about net metering? Net metering benefits you with reduced electricity bill by cutting down the amount of electricity from the distribution company. You receive credits for the electricity that you generated but didn’t use. On top of getting a monetary benefit, you get the peace of mind that…
Below is the sample of the NEM Billing. Click the image below to zoom in.