Let our experts find the best solar system for you

NEM 3.0 is now open for applications!

GET QUOTE NOW

  • This field is for validation purposes and should be left unchanged.

NEM Rakyat

The Programme NEM Rakyat is designed to cater to domestic consumers with solar PV systems installed in their homes or residences, with the arrangement that these consumers will consume first the energy produced through such systems. Any excess energy produced through the solar PV systems will be exported to the grid through a “one-on-one” offset basis for a term of ten years.

The Programme NEM Rakyat has an allocation of 100MWac, and capacity limits of 4kWac for single-phase and 10kWac for three-phase, respectively.

Documentary checklist for NEM Rakyat application (individual):

  • Clear copy of most recent (past 3 months) electricity bills
  • A clear photo of the supply meter indicating the meter serial number
  • Clear copy (front and back copies) of MyKaD, indicating the same account holder for TNB/SESB)
  • Documents on proof of ownership and right of use, such as the following: (1) Land title or sales and purchase agreement, (2) Lease agreement
  • ERS NEM quotation proposal; must be signed
  • SEDA Net Energy Metering (NEM) Application Form, completely filled-up (Part 1A, Section 2.1 and 2.2)
  • Duly signed SEDA (NEM) Net Energy Metering Application Form (Part 6 Declaration for NEM application)
  • TNB Net Energy Metering (NEM) Application Form (2 sets; Part 4 NEM Consumer’s Declaration)
  • Net Energy Metering (NEM) Contract for Rakyat Programme (2 sets, total of 14 pages, with initial indicated at the bottom right corner of each of the pages

Documentary checklist for NEM Rakyat application (non-individual):

  • Clear copy of most recent (past 3 months) electricity bills
  • A clear photo of the supply meter indicating the meter serial number
  • Clear copy (front and back copies) of MyKaD, indicating the same account holder for TNB/SESB
  • Documents on proof of ownership and right of use, such as the following: (1) Land title or sales and purchase agreement, (2) Lease agreement
  • Certification of Incorporation or Certificate of Registration
  • SEDA Net Energy Metering (NEM) Application Form, completely filled-up (Part 1B, Section 2.1 and 2.2)
  • Duly signed SEDA (NEM) Net Energy Metering Application Form (Part 6 Declaration for NEM Non-Individual application)
  • TNB Net Energy Metering (NEM) Application Form (2 sets; Part 4 NEM Consumer’s Declaration)
  • Net Energy Metering (NEM) Contract for Rakyat Programme (2 sets, total of 14 pages, with initial indicated at the bottom right corner of each of the pages)
  • Duly-signed ERS NEM proposal or quotation.

 

null

NEM Rakyat

Quota Balance: 90.89MW
Quota Taken 9.11MW

null

NEM GoMEn

Quota Balance: 87.23MW
Quota Taken 12.77MW

null

NOVA

Quota Balance: 77.42MW
Quota Taken 222.58MW

Quota Allocation

NEM 3.0 Initiative/programmeNEM RakyatNEM GoMEnNOVA
Year2021 – 2023
Total, MWac100100300
Enter Your Name & Email to Receive Our Latest Promotion!
  • This field is for validation purposes and should be left unchanged.
Electric vehicle charging station
Important Links
Seda Malaysia
Kettha Malaysia